Client:
ALCOA
Project:
Haul Road Construction
Location:
Huntly and Willowdale, WA
Summary:
The project involved the construction of 1200km of haul roads for a long term client.
CHC maintained a good understanding of the job scope.
Strong resource management to maintain targets set by the client.
A good working relationship was held between CHC and the client.
Haul roads programme was always delivered on time and on budget.
Key activities:
- topsoil removal
- secondary overburden removal
- SOBR Backfill
- drill and blast
- dozer levelling
- load and haul
- subgrade trim
- gravel placement
- bund and sump trimming
- culverts and drainage installation